Main objective of the Polis intervention
in which this project is included, is the city requalification through
the creation of an enviromental system created around the Jarda torrent
(Linear urban park).
the constrains of the Detailed Plan regarding location of the new
building are mainly the implantation area, the area and the requirement
of a free ground floor, dictated from the floods maximum level of the
existing torrent.
Objectives
To create distinctive areas with different levels of privacy, from public, semi-publics to private.
To create easy accessibility to the building, both physically and visually;
To create visual continuity between the park and the garden area;
To choose a solar orientation which privileges the classroom zones
directing them south and simoultainosly relating to the garden and the
park.
to operate the division between the working zones (classes and support
zones ) through a central corridor which allowed a clear interpretation
of the spaces;
to use passive energy systems in the building.
Program
In the ground level, a rithmated volume
of opaque and translucides areas, separates the public accesses and the
parking zone from the private zone of the children's garden . It also
contains the vertical accesses (stairs and elevator) and the technical
zones. The vertical accesses converge, in the two upper levels, to a
hall which is directly linked to the central corridor. the classromms
are found in the southern part whereas the support areas and offices in
the northern.
In the first level we can find the kindergarten program (secretariat
area,gymnasium and reading room) where the classrooms have a
preferencial relation with the garden, through the footbridges that
communicate to it directly. At the second level the classes of the
study hall (in Portugal divided in two turns morning/afternoon ) and
others services. Two volumes are distinguished in the two levels. The
bathrooms.
Materials and sustainability
The building is built in white concrete,
armed, thrown in yard, being the south side covered with panels of
cement agglomerated pigmented sawdust of black color, with volumes
which stuck out allowing the solar control as offering a peculiar space
for the class activity. The inner face of this structure is covered,
almost like a second skin with panels of Thermical insulation, a third
skin in bricks protect the insulation panel and guarantees thermal
inertia to the inside of the building.
The heating system is based on a mixed system of solar panels and gas
boiler, supplying hot water for normal use and to the radiating
pavement. The ventilation of the building is induced by the difference
of pressure of the forced extraction of the air which take place in the
bathrooms modules. The air enters the building through the present
systems of grilles included in the thermal fixtures in aluminum. The
system that collect the rain water, converges in to a deposit which
then redistributes to the flushing system of thr W.C.s beeing also used
to water the garden. The deposit, in the absence of rain, is fed from
the public net.